Availability: | |
---|---|
Quantity: | |
Product Description
Differential Assembly for Foton Auman Truck Spare Parts AK*HFF2510113CK4GFT-1
Product Description:
Product advantages:
(1) The input shaft is made of 42Crmo material, which has higher toughness and higher fatigue resistance.
(2) The original gasket used in the differential assembly is 20# sheet material, soft nitrogen treated, hardened layer depth 0.15~0.3, hardness HV395-535, differential planetary gasket full arc, with stronger resistance Abrasive.
(3) The composite copper sleeve can more effectively protect the gear and cross shaft and effectively prevent the gear from burning.
(4) Use original nuts, the threads have stronger hardness, and apply anaerobic thread locking glue to prevent the nuts from falling off.
(5) The differential cross shaft adopts 22CrMnMo mechanical strength, which better strengthens the fatigue resistance of the cross shaft. The plane structure of the shaft body makes the lubricating oil lubrication smoother.
Working principle of wheel rim inner ring gear and inner ring gear bracket:
The wheel reducer is mainly composed of a sun gear, a planet gear, a ring gear and a planet gear carrier. Generally, the sun gear, the active part, is connected to the half shaft, the planet carrier, the passive part, is connected to the wheel, and the inner ring gear of the wheel is connected to the axle housing. The wheel reducer is used to improve the driving force of the car to meet or correct the entire transmission. Matching of system forces. The wheel reducer currently used is a set of gear transmission devices that reduce speed and increase torque to meet the matching needs of the entire transmission system.
quality assurance:
Vertical lathe machining center - CNC center - Boring machining center - High-precision grinder - Metallographic inspection - Automated three-coordinate inspection
Factory Show
Company advantages
FAQ
Q1.How about price of products?
The price is nogotiable. It can be changed according to your quantity or package. When you are making an inquiry, please let us know the quantity you want.
Please provide the exact or approximate quantity, packing details, destination port or special requirements, so we could give you the price accordingly.
Q2.what is the products delivery time?
Generally, it will take 3 to 10 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q3.Do you test all your goods before delivery?
Yes,we have 100% test before delivery.
Q4.What is your terms of payment?
By TT or We'll show you the photos of the products and packages before you pay the balance.
Q5. Do you accept third party inspection?
Yes.we do
Q6. Are you a factory or trading company?
We are a factory integrating research, development, production and sales.
Certification